| November
- December 2000 |
 |
Demolition
of the old Giraffe House, Hippo House and Aviary in
Dublin Zoo, all while the Zoo was open to the public.
|
| November
- December 2000 |
 |
| Enabling
works and partial demolition to 13/14 Burgh Quay, the
old 'Irish Press' Building. This work included the design
and erection of temporary works that allowed all of
the existing stabilising core structures to be removed
without compromising the building. Also included the
removal of the foundations to two load-bearing columns,
using enabling temporary works, to allow the excavation
of the new lift shaft.
|
| September
- October 2000 |
 |
Following
a disastrous attempt by the builder to remove part of
'Cumiskeys' Pub on Dominick Street, we were called in
to (a) stabilise the building (still occupied and trading),
(b) design and erect temporary works, (c) demolish half
of the building.
This work was executed without causing any further movement
to the building while ensuring that the business remained
trading and the residence above remained habitable.
|
| June
- August 2000 |
 |
| Gutting
out of 'Block 66'. This building was the office accomodation
for Fine Gael and Fianna Fail within Government Buildings,
and the work had to be carried out under the strictest
of controls.
|
| May
- July 2000 |
 |
Removal
of all internal walls in the basement of the Department
of Finance. These were built to provide a bomb shelter
in case of emergency and included a structural steel
frame in case the building overhead collapsed. All of
this material had to be demolished and removed without
interfering with the Department which continued its
business overhead.
|
| April
- October 2000 |
 |
Retention
works to nr.26 Camden Street ' Bridget Moore Bridal
Designs' and the demolition of the adjoining building.
This work included the design of the temporary works.
Also included was the bulk excavation and drainage work.
Breaking and cutting of piles was also done, as was
difficult hand excavation next to the retained building.
|
| January
- November 2000 |
 |
Demolition
of Mount Salus Press printing works on Kevin Street,
including support work to explosive contractor. Subsequent
excavation to a depth of 8m including design and erection
of temporary propping to adjoining properties. Also
included was all support work to the main contactor,
McNamara, which incorporated breaking and cutting piles.
|
| November
1999 - March 2000 |
 |
Demolition
of old Macushla Bingo Hall on Foley Street, Dublin 1,
and the subsequent sheet piling, propping, and excavation.
Temporary propping to adjoining property on Buckingham
Street.
|
|