| November
2001- February 2002 |
 |
Selective
demolition, underpinning and temporary supports (including
design) for Tolmac Construction at High Park School,
Grace Park Road, Drumcondra.
|
| October
- December 2001 |
 |
Needling
& propping, other temporary works, underpinning
and more demolition to 71 Merrion Square for Pierse
Building Services. Again this work could only be accessed
through the building from Merrion Square.
|
| September
2001 |
 |
Removal
of asbestos elements and demolition of buildings at
Peamount Hospital, Newcastle, Co. Dublin. This work
had to be completed safely while the hospital remained
open with patients and visitors coming and going as
usual.
|
| September
- October 2001 |
 |
Selected
temporary works and remedial structural repairs to an
industrial unit in the Dunlop Centre, Dublin 2.
|
| June
- October 2001 |
 |
Selective
demolition and enabling works, including needling and
propping, to a building on Sorrento Terrace in Dalkey
for Pierse Building Services.
|
| August
- September 2001 |
 |
Demolition
of premises at North Brunswick Street, Dublin 1, and
subsequent removal of debris including the safe emptying,
grubbing up, and removal of an underground fuel storage
tank.
|
| June
- August 2001 |
 |
Demolition
of buildings to the rear of 71 Merrion Square, Dublin
2, carried out with no rear access. Breaking of and
removal of basement floor slab, excavation for drainage.
All of the work on this project had to be carried out
by hand and 1.5t mini excavator with all resulting debris
removed from the building without the use of rear access,
or direct access to the front of the building.
|
| May
- August 2001 |
 |
Temporary
works to the rear of two Georgian buildings on Clare
Street, Dublin 2. These buildings are owned by the National
Gallery of Ireland and are part of the new gallery currently
under construction. This work consisted of carrying
the total load of two bows to the rear of the buildings,
remove cast iron columns, and leave ready for the building
of new brick piers to restore the Georgian rear facades.
|
| February
- April 2001 |
 |
Breaking
and excavation to the lower ground floor of number 6
Raglan Road, along with selected design and erection
of temporary works for new openings building is the
new residence of Mr. Denis O' Brien.
|
| December
2000 - April 2001 |
 |
Needling
and propping to five walls in number 5 College Street.
This is a listed building within the new 'WestInn' Hotel
development on Westmoreland Street. The propping allowed
the installation of 'picture frame' permanent steel
work (by us) to provide vehicular access to the new
underground carpark. Also included in this project were
excavations within the basement to allow the construction
of the new bar and toilet areas.
|